ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) MELALUI METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN PACKER DI PABRIK SEMEN PT. XYZ
Keywords:
Overall Equipment Effectiveness, Availability Ratio, Performance Efficiency Ratio Rate Of Quality.
Abstract
- XYZ is a manufacturing company engaged in the production of red and white cement. PCC cement packaging uses the main machine, namely the Rotary Packer machine, the packaging depends on consumer demand. If consumer demand continues to increase, the packaging process will take place continuously without stopping, and on the contrary, if consumer demand decreases slightly, the packaging process will also take place less. The high downtime of the Packer 1 machine causes production targets to be achieved, delays in the distribution process, and non-productive activities for employees. Based on these problems, the calculation of the effectiveness value on the Packer 1 machine using the Overall Equipment Effectiveness (OEE) method. Which aims to determine the value of OEE (Overall Equipment Effectiveness) of the Packer 1 machine, to determine the comparison of the OEE value of the Packer 1 machine with international OEE values, and to determine the priority factors for repair and the root causes of problems and solutions. Based on the results of data processing, it can be concluded that the Packer 1 machine OEE value is 16.98% which is obtained from the Availability Ratio value of 49.48%, the Performance Efficiency Ratio of 30.04 and the Rate of Quality product of 100%.
Downloads
Download data is not yet available.
References
[1] Nadia Cynthia Dewi, “ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DENGAN PERHITUNGAN OVERALL EQUIPMENT EFECTIVENESS (OEE) DAN SIX BIG LOSSES MESIN CAVITEC PT. ESSENTRA SURABAYA,” Ind. Fak. Tek. Univ. Diponegoro, pp. 1–17.
[2] F. H. Siregar1, A. Susilawati2, D. S. Arief, and 3, “ANALISA PERFORMANCE MESIN SCREW PRESS MENGGUNAKAN METODA OVERALL EQUIPMENT EFFECTIVENESS (STUDI KASUS: PTPN V SEI PAGAR),” Jur. Tek. Mesin, Fak. Tek. Univ. Riau, vol. 4, no. 1, p. 8, 2017.
[3] M. Z. Z. Muhtadi1, “MANAJEMEN PEMELIHARAAN UNTUK OPTIMALISASI LABA PERUSAHAAN,” J. Pendidik. Akunt. Indones., vol. VIII, no. 1, pp. 35–43.
[4] Y. N. Sandra Dewi Saraswati, “Sistem Informasi ‘Maintenance AC’ Berbasis Web Pada PT. Unggul Bayu Pratama Jakarta,” J. Ris. Komput., vol. Vol. 6, no. no 3, p. : 222-226.
[5] Muchtar Ginting, “ANALISA ‘TOTAL PRODUCTIVE MAINTENANCE’ TERHADAP EFEKTIVITAS PRODUKSI TONGKAT,” J. AUSTENIT, vol. VOLUME 1, no. NOMOR 2, pp. 31–37.
[6] Andita Rahayu, “EVALUASI EFEKTIVITAS MESIN KILN DENGAN PENERAPAN TOTAL PRODUCTIVE MAINTENANCE PADA PABRIK II/III PT SEMEN PADANG,” Optimasi Sist. Ind., vol. 13, no. 1, pp. 454–485, 2014.
[7] R. Y. E. Afif Fahmi1), Arif Rahman2), “IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE SEBAGAI PENUNJANG PRODUKTIVITAS DENGAN PENGUKURANOVERALL EQUIPMENT EFFECTIVENESS PADA MESIN ROTARY KTH-8 (Studi Kasus PT.Indonesian Tobacco),” Tek. Ind., pp. 75–84.
[8] Erni Krisnaningsih, “USULAN PENERAPAN TPM DALAM RANGKA PENINGKATAN EFEKTIFITAS MESIN DENGAN OEE SEBAGAI ALAT UKUR DI PT XYZ,” J. PROSISKO, vol. Vol. 2, no. No. 2, pp. 13–26.
[9] HENDRIK SUTIKNO, “PENGUKURAN DAN ANALISIS EFEKTIVITAS MESIN DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIFENESS (OEE) ( STUDI KASUS CV. INDAH CEMERLANG ),” ft, pp. 1–37, 2017.
[10] M. Nur1 and Mhd. Ihsan Hidayat2, “Analisis Nilai Overall Equipment Effectiveness Pada Mesin Packer Di PT. Semen Padang Unit Produksi Dan Pengantongan Dumai,” J. Has. Penelit. dan Karya Ilm. dalam Bid. Tek. Ind., vol. Vol.3, no. No.2, pp. 110–115, 2017.
[2] F. H. Siregar1, A. Susilawati2, D. S. Arief, and 3, “ANALISA PERFORMANCE MESIN SCREW PRESS MENGGUNAKAN METODA OVERALL EQUIPMENT EFFECTIVENESS (STUDI KASUS: PTPN V SEI PAGAR),” Jur. Tek. Mesin, Fak. Tek. Univ. Riau, vol. 4, no. 1, p. 8, 2017.
[3] M. Z. Z. Muhtadi1, “MANAJEMEN PEMELIHARAAN UNTUK OPTIMALISASI LABA PERUSAHAAN,” J. Pendidik. Akunt. Indones., vol. VIII, no. 1, pp. 35–43.
[4] Y. N. Sandra Dewi Saraswati, “Sistem Informasi ‘Maintenance AC’ Berbasis Web Pada PT. Unggul Bayu Pratama Jakarta,” J. Ris. Komput., vol. Vol. 6, no. no 3, p. : 222-226.
[5] Muchtar Ginting, “ANALISA ‘TOTAL PRODUCTIVE MAINTENANCE’ TERHADAP EFEKTIVITAS PRODUKSI TONGKAT,” J. AUSTENIT, vol. VOLUME 1, no. NOMOR 2, pp. 31–37.
[6] Andita Rahayu, “EVALUASI EFEKTIVITAS MESIN KILN DENGAN PENERAPAN TOTAL PRODUCTIVE MAINTENANCE PADA PABRIK II/III PT SEMEN PADANG,” Optimasi Sist. Ind., vol. 13, no. 1, pp. 454–485, 2014.
[7] R. Y. E. Afif Fahmi1), Arif Rahman2), “IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE SEBAGAI PENUNJANG PRODUKTIVITAS DENGAN PENGUKURANOVERALL EQUIPMENT EFFECTIVENESS PADA MESIN ROTARY KTH-8 (Studi Kasus PT.Indonesian Tobacco),” Tek. Ind., pp. 75–84.
[8] Erni Krisnaningsih, “USULAN PENERAPAN TPM DALAM RANGKA PENINGKATAN EFEKTIFITAS MESIN DENGAN OEE SEBAGAI ALAT UKUR DI PT XYZ,” J. PROSISKO, vol. Vol. 2, no. No. 2, pp. 13–26.
[9] HENDRIK SUTIKNO, “PENGUKURAN DAN ANALISIS EFEKTIVITAS MESIN DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIFENESS (OEE) ( STUDI KASUS CV. INDAH CEMERLANG ),” ft, pp. 1–37, 2017.
[10] M. Nur1 and Mhd. Ihsan Hidayat2, “Analisis Nilai Overall Equipment Effectiveness Pada Mesin Packer Di PT. Semen Padang Unit Produksi Dan Pengantongan Dumai,” J. Has. Penelit. dan Karya Ilm. dalam Bid. Tek. Ind., vol. Vol.3, no. No.2, pp. 110–115, 2017.
Published
2020-03-30
How to Cite
Pratama, M. A., Kurniawan, F. A., & Irwan, A. (2020, March 30). ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) MELALUI METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN PACKER DI PABRIK SEMEN PT. XYZ. JiTEKH, 8(1), 11-21. https://doi.org/https://doi.org/10.35447/jitekh.v8i1.305
Section
JITEKH